← Insights

Integrating a SACCO core in eleven weeks

Centerbolt Engineering · 24 September 2026

Riftline SACCO needed its member portal connected to a legacy core banking system ahead of a SASRA audit.

We split delivery into four gated milestones — read-only sync, statements, loan applications, and payments — each signed off in the client portal before the next began.

No milestone slipped by more than three days, and the audit closed with zero IT findings.